Grand Region As-Needed Maintenance 2021: The first of it's kind this project is for needed repairs for MDOT's Grand Region. The project goals were to complete a priority list of 10 projects. These projects with the highest priority were:
M-21: HMA Skip Patching: Concrete Patching
M-66: Concrete Patching
11 Mile Rd./ US-131: Interchange Ramp Improvement
M‐43 2: Full depth joints & mastic patching: Concrete Patches
32nd St over US‐131: Bridge
US‐131 SB over The Kalamazoo River (03111‐ B01‐2): Bridge and Construction Inspection
This second round of projects were completed with the remaining budget and time allotted in the schedule for completion:
US‐131 south of 120th Ave.: Slope failure: Slope repair OR M‐43 2: Full depth joints & mastic patching: Concrete Patches
M‐21 West of Turkey Trail: Resurfacing & Shoulder Repairs workflow
"US‐131 at M‐6 Interchange ramps: Concrete Patches"
I‐196 interchange ramp and over street at 68th St: Concrete Patches
Grand Region As-needed Maintenance 2022: Value Engineering is providing As-Needed Maintenance for MDOT's Grand Region. Services for this contract include design services to prepare scoping estimates, final design (typically in the log format) and specifications, utility coordination, construction inspection and material testing, bridge approach slab/joint replacement and miscellaneous maintenance bridge deck repair design and detailing, and design and/or ROW surveys as required. The project goals are to complete a priority list of the following 11 projects :
I-96 EB & WB from M-66 to Clinton County Line (Ionia County)
M-21 500' west of Turkey Trail (Ionia County)
Woodward Avenue over US-131 (Mecosta County)
18 Mile over US-131 (Osceola County)
I-96 EB & WB from M-66 to Clinton County Line (Ionia County)
M-66 Grand River to Tuttle, M-21 to Dildine, Long Lake to Montcalm (Ionia County)