Value Engineering was a prime consultant performing work under MDOT, represented by the owner’s representative consultant (ORC), for this project. VE’s limits include all the service drives and crossroads from Burns Ave. to Conner St. (but excluding Conner St.), inclusive of a handful of other connected side streets and freeway ramps that lead to and from the crossroads.
VE was selected to develop maintenance traffic plans, specifications, and engineering cost estimates as a Prime Consultant under MDOT. The work for this project included assisting and completing the maintenance of traffic plans, including a transportation management plan (TMP), Maintenance of Traffic Special Provision), and staging plans.
Roadway Design: Value Engineering (VE) was a sub-consultant for this aspect of the project to perform Design: Roadway-Complex services. VE provided complex roadway design services for the I-94 Modernization project for Cadillac Ave. bridge approaches and service drives. VE developed the final road design for this portion of the project. VE coordinated with the prime consultant, as well as other designated sub-consultants, for the design and completion of project deliverables. Reference information documents (RID) and supplemental documentation for the applicable milestone submittals were compiled and submitted.